Tuesday, June 18, 2013

New Animation for Drill Subs. Vortex System Optimized Hydraulics. The Vortex Sub.

We have a new animation which was created for Drill Subs. Here's what our client, Drill Subs, has to say about it:
Hi Beau, I just wanted to take a quick moment to say what an exceptional job you and your team did in creating our tool animation. From our original thoughts to your concept designs to final completion, the piece your team put out was above and beyond what we expected. You communicated throughout the process and was always available if we had questions. Very professional and I can't say thank you enough!!

Shaun Herring
Field Tech
Drill Subs

Drill Subs Vortex System Optimized Hydraulics. The Vortex Sub. 3 uniquely engineered nozzels.

Standard BHA without a Vortex Sub:
-Decrease in ROP
-Constant grinding of cuttings
-Additional bit trips
-Bit Balling
-Cuttings stuck at the cruve

Standard BHA with a Vortex Sub:
-Creates a near bit vortex within the drilling fluid
-Increases fluids velocity and kinetic energy
-Strong turbulence and effcient removal of cuttings
-Extends bit life
-Fewer bit trips
-Less balling
-Optimizes down-hole hydraulics
-Will not wash well bore

Increasing ROP, Decreasing Cost: Test and field results demonstrate an increase in ROP on average of 155 to 25%

Production string drilling time reduced from: 6 days to 4 1/2 days. 14 days to 12 days. 18 days to 15 days.

One piece steel body design. 4 1/2" regular API tool joint connection. 10" shoulder to shoulder. 3 Tungsten Carbide jet nozzles available in multiple API sizes to adjust TFA and optimize down-hole hydraulics.

911 Easy Highway 377
Texana Plaza, Suite 11
Granbury, Texas 76048
www.drillsubs.com

Drill Subs, a division of RITE INCREASER, LLC - PATENT PENDING

Animation by Industrial3D, Inc: www.industrial3d.com

No comments:

Post a Comment