Tuesday, March 25, 2014

Turnco B.R.I.T.E. System Video by Industrial3D

Turnco B.R.I.T.E. System | Billing Reporting Information Technology Equipment syste. Video by Industrial3D about Turnco's B.R.I.T.E. System.  

"Turnco's B.R.I.T.E. system distinguishes us from our competition by providing our customer with immediate real-time Billing and Inspection information from anywhere on the globe. Turnco's commitment to technology and efficiency led us to develop an electronic system that can be used for a variety of purposes, mainly making our customers life easier. B.R.I.T.E stands for Billing Reporting Information Technology Equipment system. Via the B.R.I.T.E system, we provide our customers with a secure web based platform that can access all Field Inspection Tickets, Billing Authorizations, and other important information related to the inspection that is taking place at their facility. With the B.R.I.T.E system, customers can build customized reports, mine data, and it is a powerful tool to assist in Failure Analysis. The system has also been designed to enhance the quality of Turnco's product by tracking calibration data for equipment and linking inspection processes to appropriate SOPs." - From Turnco's website: http://www.turncollc.com

Wednesday, January 8, 2014

3D Oil and Gas Graphics: Subsea Products

Happy New Year! Let's start the year off with Industrial3D's latest & greatest 3D oil & gas graphic for client Sivaco, showing Subsea products.


3D visualization of subsea oil and gas products.

Monday, December 23, 2013

Demo Reel: Animations and Illustrations by Industrial3D in 2013

Industrial3D's demo reel of the work done in 2013: Rig animations, Downhole/Subsea animations, 3D product models, 3D product model animations, video production, 3D posters & illustrations.

2013 clients featured on the demo reel: Unit Drilling, Geotek Energy, Honghua America, Sercel-GRC, Pioneer Driling, McADA (McADA Fluids Heating Services), Helmerich & Payne Inc, Ocean Rig.

Tuesday, December 10, 2013

Industrial3D's 2013 Christmas Video | Meet the Staff & See New Work - Animation & Video Production



Industrial3D's newest video production will introduce you to the staff at Industrial3D through an exciting & creative video production - the first of it's kind from Industrial3D. You will also see new animations & graphics by Industrial3D and the newest service offered - video production.


Monday, November 11, 2013

Latest & Greatest From Industrial3D: Animation for Unit's New, High-Tech Rig Known As The BOSS

Unit Drilling Company has a new, high-tech rig known as the BOSS. The new drilling gear is known as a BOSS rig, which is short for a box-on-box self-stacking rig.

It has become standard practice in much of the oil patch for companies to drill up to a dozen wells from the same drilling pad in different directions and into different rock layers. The BOSS rig is designed to move quickly around a pad to accommodate multiple wells.

The BOSS will be equipped with two 2,200 horsepower mud pumps and will be designed to move easily.

The first of the new rigs is expected online by the end of the year. It will then be put into service in the Texas Panhandle or in western Oklahoma. Unit then plans to begin working on its second new rig, which will be used in North Dakota.

The Oklahoman covered the story of Unit's new rig: http://newsok.com/tulsa-based-companys-high-tech-rig-offers-design-technology-for-the-future/article/3887104


Monday, October 7, 2013

Unit Corp's New, High Tech Drilling Rig - Graphics & Animation by Industrial3D

Industrial3D would like to congratulate Unit Corp on their new high tech drilling rig and story in the Oklahoman. The graphic and animation for Unit's new drilling rig was done by Industrial3D. Read the full story below:


Tulsa-based company's high-tech rig offers design, technology for the future

Unit Corp. is working on a new type of drilling rig that will be assembled at the Tulsa company's Oklahoma City yard.

In its 50th year, Tulsa-based Unit Corp. is looking to boost its drilling rig operations with a new, high-tech rig that will be assembled at its Oklahoma City manufacturing center

“We went 20 years in this industry with no new technology, but in the last 10 years everything's changed,” Unit CEO Larry Pinkston said.

Pinkston and other Unit executives and employees were in Oklahoma City this week to celebrate the company's 50th anniversary.

The new drilling gear is known as a BOSS rig, which is short for a box-on-box self-stacking rig.

“It will be the only rig in the industry with this type of design,” Pinkston said. “With this rig, we've looked at all the new rigs that are coming through the industry over the last three or four years and have taken what we've liked off all those different rigs and put it all on this rig.”

Pinkston said the company's new rig is designed to meet the rapidly changing needs of the oil and natural gas industry.

“One of the most exciting things right now in the industry is that it's almost like the oil and gas industry is starting over,” he said. “We're going back into old fields, drilling wells with a wonderful rate of return in fields that haven't had wells drilled in them in 20 years.”

It has become standard practice in much of the oil patch for companies to drill up to a dozen wells from the same drilling pad in different directions and into different rock layers. The BOSS rig is designed to move quickly around a pad to accommodate multiple wells.

“It used to be that to take a rig down and put it back up was a three- to four-day process. Now you can skid a rig in a couple of hours,” Pinkston said. “That's a tremendous efficiency gain during the drilling process.”

The rig will be equipped with two 2,200 horsepower mud pumps and will be designed to move easily.

“Everything you would like to see in technology, the rig will have it,” Pinkston said.

The first of the new rigs is expected online by the end of the year. It will then be put into service in the Texas Panhandle or in western Oklahoma.

Unit then plans to begin working on its second new rig, which will be used in North Dakota.

“At a minimum, we need four to five out in the field running,” Pinkston said. “We really think with customer demand we will have more than that.”

In an August analyst presentation, Pinkston said the BOSS rigs will cost about $20 million to build and complete. Rigs designed for delivery in Wyoming and North Dakota cost up to an additional $2 million to prepare them for the cold climate.